{"change_counts":{"contingencies":{"boilerplate":6,"indexed":39,"total":45},"legal_proceedings":{"boilerplate":13,"indexed":8,"total":21},"risk_factors":{"boilerplate":87,"indexed":164,"total":251}},"change_files":[{"count":21,"from_date":"2021-04-28","kind":"legal_proceedings","path":"company/0000012927/changes-legal_proceedings.json","to_date":"2026-10-27"},{"count":45,"from_date":"2021-04-28","kind":"contingencies","path":"company/0000012927/changes-contingencies.json","to_date":"2026-10-27"},{"count":251,"from_date":"2022-01-31","kind":"risk_factors","path":"company/0000012927/changes-risk_factors.json","to_date":"2026-01-30"}],"changes":[{"file":1,"from_accession":"0000012927-21-000011","items":[{"change_type":"modified","id":"chg_e58921396719aa15","materiality":0.663,"snippet":"…compliance reporting and internal controls mechanisms. We expensed $743.6 million in the fourth quarter of 2020 related to this agreement. During the first quarter, consistent with the terms of the…","tags":["amount","government_inquiry","settlement"]}],"kind":"contingencies","to_accession":"0000012927-21-000040"},{"file":1,"from_accession":"0000012927-21-000094","items":[{"change_type":"modified","id":"chg_ac59b2e4d1b97bfa","materiality":0.91,"snippet":"…accident of Ethiopian Airlines Flight 302. During the fourth quarter of 2021, we entered into a proposed settlement with plaintiffs in a shareholder derivative lawsuit. Under the proposed…","tags":["amount","amount_changed","government_inquiry","litigation","settlement"]},{"change_type":"modified","id":"chg_2a76e90b7d46e130","materiality":0.785,"snippet":"…requires that we make payments totaling $2,510, which consist of (a) a $244 criminal monetary penalty; (b) $500 in additional compensation to the heirs and/or beneficiaries of those who died in the…","tags":["amount","amount_changed","government_inquiry","settlement"]}],"kind":"contingencies","to_accession":"0000012927-22-000010"},{"file":2,"from_accession":"0000012927-21-000011","items":[{"change_type":"modified","id":"chg_5b3fc98e8f2a0956","materiality":0.124,"snippet":"…our business, financial condition, results of operations and cash flows. We also face significant risks related to the global economic downturn and severe reduction in commercial air traffic caused…","tags":[]},{"change_type":"modified","id":"chg_43ba67037c9becb9","materiality":0.134,"snippet":"…included, and may in the future include, production site shutdowns, workplace disruptions and restrictions on the movement of people, social distancing guidelines, increased employee absenteeism…","tags":[]},{"change_type":"modified","id":"chg_9a67fc25b338a34d","materiality":0.135,"snippet":"During the second quarter of 2020, we temporarily suspended operations in Puget Sound, South Carolina, and Philadelphia, as well as at several other key production sites. We had not previously…","tags":[]},{"change_type":"modified","id":"chg_8da3df4fa9153482","materiality":0.133,"snippet":"…operations during the second quarter of 2020. In 2021, we experienced part shortages which disrupted our operations and delayed deliveries. We may experience additional disruptions and/or part…","tags":[]},{"change_type":"modified","id":"chg_7ec362a6e26da57f","materiality":0.134,"snippet":"Further production disruptions and inefficiencies, suspension of operations or delayed recovery in our operations, and/or any comparable impacts involving one or more of our key suppliers, or the…","tags":[]},{"change_type":"modified","id":"chg_1d5696b102ebf899","materiality":0.212,"snippet":"…During the year ended December 31, 2021, net cash used by operating activities was $3.4 billion. At December 31, 2021, cash and short-term investments totaled $16.2 billion. Our debt balance…","tags":["amount","amount_changed"]},{"change_type":"modified","id":"chg_32d559a848f365b0","materiality":0.244,"snippet":"…has impacted passenger traffic most severely. Most airlines have significantly reduced their capacity, and many could implement further reductions. Many airlines are also implementing significant…","tags":["amount","amount_changed"]},{"change_type":"modified","id":"chg_955e70e24c70ea6f","materiality":0.132,"snippet":"…is significant uncertainty with respect to whether and at what point commercial air traffic capacity will return to and/or exceed pre-COVID-19 levels. This uncertainty may have a significant impact…","tags":[]},{"change_type":"modified","id":"chg_f3a874b04a66995a","materiality":0.126,"snippet":"…of the other risks described below. For example, the COVID-19 pandemic could cause and continue to cause an increasingly competitive labor market due to a sustained labor shortage or increased…","tags":["amount"]},{"change_type":"modified","id":"chg_881811170cd73a98","materiality":0.232,"snippet":"We remain subject to a number of risks and uncertainties related to the 737 MAX. These risks include uncertainties regarding the timing and conditions of remaining 737 MAX regulatory approvals,…","tags":["government_inquiry"]},{"change_type":"modified","id":"chg_3252ca2a69f811a8","materiality":0.633,"snippet":"On March 13, 2019, the FAA issued an order to suspend operations of all 737 MAX aircraft in the U.S. and by U.S. aircraft operators following two fatal 737 MAX accidents. Non-U.S. civil aviation…","tags":["amount","amount_changed","government_inquiry","litigation","settlement"]},{"change_type":"modified","id":"chg_ded035f41ee71d2e","materiality":0.237,"snippet":"…suspend 737 production. Impacts related to our suspension of 737 MAX production from 2019 to 2020 significantly increased costs to produce aircraft included in the current accounting quantity and…","tags":["amount","amount_changed"]},{"change_type":"modified","id":"chg_c69c60d7bc90f876","materiality":0.233,"snippet":"…non-recurring costs, and routine warranty costs. We have made assumptions regarding outcomes of accident investigations and other government inquiries, timing of future 737 production rate…","tags":["government_inquiry"]},{"change_type":"modified","id":"chg_ac025d446a39947c","materiality":0.13,"snippet":"…to maintain a healthy production system, ensure every airplane in our production system conforms to our exacting specification, achieve planned production rate targets, successfully develop new…","tags":[]},{"change_type":"modified","id":"chg_d9d850b7b7474ded","materiality":0.165,"snippet":"…certification, and performance and reliability standards. The FAA has been working to implement safety reforms such as the implementation of the 2018 FAA Reauthorization Act and the 2020 Aircraft…","tags":[]},{"change_type":"modified","id":"chg_7ce8a1ce2d68cfa4","materiality":0.134,"snippet":"…must minimize disruption caused by production changes, achieve operational stability and implement productivity improvements in order to meet customer demand and maintain our profitability. We have…","tags":[]},{"change_type":"modified","id":"chg_bbd3b42df08faf62","materiality":0.126,"snippet":"…fleet support costs. For example, in 2021, we performed additional inspections and associated rework on 787 aircraft in inventory and continued discussions with the FAA regarding required actions…","tags":[]},{"change_type":"modified","id":"chg_5d24ae2b947bcf0b","materiality":0.166,"snippet":"The timeliness of FY22 and future appropriations for government departments and agencies remains a recurrent risk. A lapse in appropriations for government departments or agencies would result in a…","tags":[]},{"change_type":"modified","id":"chg_2840be21edb1fa23","materiality":0.142,"snippet":"…to continue to emphasize affordability, innovation, cybersecurity and delivery of technical data and software in its procurement processes. If we can no longer adjust successfully to these changing…","tags":[]},{"change_type":"added","id":"chg_66e10b8ae2b76163","materiality":0.14,"snippet":"*changes in regulatory requirements or other executive branch actions, such as Executive Orders;","tags":[]},{"change_type":"removed","id":"chg_49c9b52112be8dc0","materiality":0.14,"snippet":"*changes in regulatory requirements;","tags":[]},{"change_type":"modified","id":"chg_17757af4feec9b5e","materiality":0.14,"snippet":"…component of our commercial airplanes backlog. Impacts from these or future potential tariffs, or deterioration in trade relations between the U.S. and one or more other countries, could have a…","tags":[]},{"change_type":"modified","id":"chg_8031d6f8dd5de63b","materiality":0.133,"snippet":"…and BGS businesses. These requirements may also result in withheld payments and/or reduced future business if we fail to comply. For example, proposals to raise domestic content thresholds for our…","tags":[]},{"change_type":"modified","id":"chg_2ee371c44d00e7eb","materiality":0.183,"snippet":"…withheld as part of the U.S. Congressional appropriations process due to fiscal constraints, changes in U.S. national security strategy and/or priorities or other reasons. Further uncertainty with…","tags":[]},{"change_type":"removed","id":"chg_5fde7248aa883127","materiality":0.21,"snippet":"Congressional appropriations process due to fiscal constraints, changes in U.S. national security strategy and/or priorities or other reasons. Further uncertainty with respect to ongoing programs…","tags":[]},{"change_type":"modified","id":"chg_dcad8327dfe1458b","materiality":0.248,"snippet":"…and BGS defense businesses generated approximately 68% and 69% of their 2021 revenues from fixed-price contracts. While fixed-price contracts enable us to benefit from performance improvements,…","tags":["amount","amount_changed"]},{"change_type":"modified","id":"chg_220a3127cb9dfcf9","materiality":0.124,"snippet":"Unauthorized access to our, our customers' and/or our suppliers' information and systems could negatively impact our business.","tags":[]},{"change_type":"modified","id":"chg_ce97ed5ac8a440a8","materiality":0.113,"snippet":"…or regulations. In some cases, we are subject to such costs due to environmental impacts attributable to our current or past manufacturing operations or the operations of companies we have…","tags":[]},{"change_type":"added","id":"chg_bc462c4f4aae4dcd","materiality":0.14,"snippet":"We may be adversely affected by global climate change or by legal, regulatory or market responses to such change.","tags":[]},{"change_type":"added","id":"chg_2623cceca695d890","materiality":0.21,"snippet":"Increasing stakeholder environmental, social and governance (ESG) expectations, physical and transition risks associated with climate change, and emerging ESG regulation and policy requirements may…","tags":[]},{"change_type":"added","id":"chg_d2d32ff3569d9aca","materiality":0.21,"snippet":"Finally, from time to time, in alignment with our sustainability priorities, we establish and publicly announce goals and commitments to improve our environmental performance, such as our recent…","tags":[]},{"change_type":"modified","id":"chg_fcb7ceae78ee2b1c","materiality":0.212,"snippet":"…credit ratings. As of December 31, 2021, our debt totaled $58.1 billion of which approximately $11.4 billion of principal payments on outstanding debt become due over the next three years. In…","tags":["amount","amount_changed"]},{"change_type":"modified","id":"chg_8a4391ed6ad92824","materiality":0.223,"snippet":"…may receive indemnification from the U.S.","tags":[]},{"change_type":"added","id":"chg_4e03d16f8c4111d9","materiality":0.21,"snippet":"government. The amount of our insurance coverage may not cover all claims or liabilities, and we may be forced to bear substantial costs. For example, liabilities arising from the use of certain of…","tags":[]}],"kind":"risk_factors","to_accession":"0000012927-22-000010"},{"file":1,"from_accession":"0000012927-22-000010","items":[{"change_type":"modified","id":"chg_f50a9b7da0347044","materiality":0.901,"snippet":"…plaintiffs in a shareholder derivative lawsuit. In March 2022, the court entered an order approving the proposed settlement and the Company committed to making certain governance changes. As a…","tags":["amount","amount_changed","government_inquiry","litigation","settlement"]},{"change_type":"removed","id":"chg_c1903aab4a8f60e1","materiality":0.88,"snippet":"On January 6, 2021, we entered into a Deferred Prosecution Agreement with the U.S. Department of Justice that resolves the Department of Justice's previously disclosed investigation into us…","tags":["amount","government_inquiry","settlement"]}],"kind":"contingencies","to_accession":"0000012927-22-000022"},{"file":1,"from_accession":"0000012927-22-000022","items":[{"change_type":"modified","id":"chg_1433d4da5d089f17","materiality":0.886,"snippet":"…result of the settlement, the Company received $219 in the second quarter of 2022. Further, we are subject to, and cooperating with ongoing governmental and regulatory investigations and inquiries…","tags":["amount","amount_changed","government_inquiry","litigation","settlement"]}],"kind":"contingencies","to_accession":"0000012927-22-000058"},{"file":1,"from_accession":"0000012927-22-000058","items":[{"change_type":"modified","id":"chg_a4aa2075b290e5d7","materiality":0.925,"snippet":"…in the second quarter of 2022. In September 2022, we settled a previously disclosed investigation by the Securities and Exchange Commission related to the 737 MAX accidents and consented to a civil…","tags":["amount","amount_changed","government_inquiry","litigation","settlement"]}],"kind":"contingencies","to_accession":"0000012927-22-000073"},{"file":1,"from_accession":"0000012927-22-000073","items":[{"change_type":"modified","id":"chg_7b24fb1f85aab679","materiality":0.925,"snippet":"…of Ethiopian Airlines Flight 302. During 2021, we entered into (i) a Deferred Prosecution Agreement with the U.S. Department of Justice that resolved the Department of Justice's previously…","tags":["amount","government_inquiry","litigation","outcome_stated","settlement"]},{"change_type":"modified","id":"chg_343522aacfec1ecf","materiality":0.242,"snippet":"…any, that may result from the arbitration, which we currently expect to be completed in late 2023 or early 2024.","tags":["amount","litigation"]}],"kind":"contingencies","to_accession":"0000012927-23-000007"},{"file":2,"from_accession":"0000012927-22-000010","items":[{"change_type":"removed","id":"chg_5565652fce39889d","materiality":0.14,"snippet":"Risks Related to COVID-19","tags":[]},{"change_type":"added","id":"chg_05d95e0b2281b2cb","materiality":0.14,"snippet":"We depend heavily on commercial airlines, subjecting us to unique risks.","tags":[]},{"change_type":"removed","id":"chg_566dcdecdbce1b54","materiality":0.21,"snippet":"We face significant risks related to the spread of the COVID-19 virus and developments surrounding the global pandemic have had, and will continue to have, significant effects on our business,…","tags":[]},{"change_type":"removed","id":"chg_618322d00ac2c4fe","materiality":0.21,"snippet":"The COVID-19 pandemic has subjected our business, operations, financial performance, cash flows and financial condition to a number of risks, including, but not limited to those discussed below.","tags":[]},{"change_type":"removed","id":"chg_284e44dfc3ebfc73","materiality":0.21,"snippet":"Operations-related risks: As a result of the COVID-19 pandemic, we are facing increased operational challenges from the need to protect employee health and safety. These challenges have included,…","tags":[]},{"change_type":"removed","id":"chg_fa05bfe3cfbaa7c7","materiality":0.21,"snippet":"During the second quarter of 2020, we temporarily suspended operations in Puget Sound, South Carolina, and Philadelphia, as well as at several other key production sites. We had not previously…","tags":[]},{"change_type":"added","id":"chg_9f47651907c7c1ea","materiality":0.14,"snippet":"Airlines also are experiencing increased fuel and other costs, and the global economy is experiencing high inflation.","tags":[]},{"change_type":"removed","id":"chg_9fca9808eac82506","materiality":0.21,"snippet":"Many of our suppliers also were required to suspend operations during the second quarter of 2020. In 2021, we experienced part shortages which disrupted our operations and delayed deliveries. We may…","tags":[]},{"change_type":"removed","id":"chg_7960cb19df1a4939","materiality":0.21,"snippet":"Further production disruptions and inefficiencies, suspension of operations or delayed recovery in our operations, and/or any comparable impacts involving one or more of our key suppliers, or the…","tags":[]},{"change_type":"modified","id":"chg_9087f9e9118f0052","materiality":0.292,"snippet":"…U.S and non-U.S. suppliers, highly-skilled labor performed by thousands of employees of ours and other partners, and stringent and evolving regulatory requirements and performance and reliability…","tags":["outcome_stated"]},{"change_type":"removed","id":"chg_7f9772eb88b34d48","materiality":0.28,"snippet":"Liquidity risks: The COVID-19 pandemic has also had a significant impact on our liquidity and overall debt levels. During the year ended December 31, 2021, net cash used by operating activities was…","tags":["amount"]},{"change_type":"added","id":"chg_18d6113b6cf9c007","materiality":0.21,"snippet":"In addition, we have experienced production quality issues, including in our supply chain, which have contributed to lower 787 deliveries, including a suspension of 787 deliveries from May 2021 to…","tags":[]},{"change_type":"removed","id":"chg_bf88213be0050d0a","materiality":0.28,"snippet":"Customer-related risks: Commercial air traffic has fallen dramatically due to the COVID-19 pandemic. This trend has impacted passenger traffic most severely. Most airlines have significantly reduced…","tags":["amount"]},{"change_type":"modified","id":"chg_dc486800fa08db9f","materiality":0.134,"snippet":"…several of our commercial aircraft programs. The 787 program is currently producing at low rates and we expect to gradually increase to 5 per month in 2023. Production of the 777X is currently…","tags":[]},{"change_type":"removed","id":"chg_46836a2ab6f2b61e","materiality":0.21,"snippet":"In addition to the near-term impact, there is risk that the industry implements longer-term strategies involving reduced capacity, shifting route patterns and mitigation strategies related to…","tags":[]},{"change_type":"modified","id":"chg_c61f4fdf6d5b7a40","materiality":0.142,"snippet":"…commercial aircraft programs could result in additional production delays and/or failure to meet customer demand for new aircraft, either of which would negatively impact our revenues and operating…","tags":[]},{"change_type":"removed","id":"chg_4acd068173362e99","materiality":0.21,"snippet":"As a result, there is significant uncertainty with respect to whether and at what point commercial air traffic capacity will return to and/or exceed pre-COVID-19 levels. This uncertainty may have a…","tags":[]},{"change_type":"modified","id":"chg_d1067d758c65cb3f","materiality":0.121,"snippet":"If our commercial aircraft fail to satisfy performance and reliability requirements and/or potentially required sustainability standards, we could face additional costs and/or lower revenues.…","tags":[]},{"change_type":"removed","id":"chg_e14c78b19e192e4f","materiality":0.28,"snippet":"Other risks: The magnitude and duration of the global COVID-19 pandemic is uncertain and continues to adversely affect our business and operating and financial results. For example, during the…","tags":["amount"]},{"change_type":"removed","id":"chg_719439cfb024a7b6","materiality":0.322,"snippet":"We remain subject to a number of risks and uncertainties related to the 737 MAX. These risks include uncertainties regarding the timing and conditions of remaining 737 MAX regulatory approvals,…","tags":["government_inquiry"]},{"change_type":"modified","id":"chg_bbeb862fc399b4b1","materiality":0.109,"snippet":"The timeliness of FY24 and future appropriations for government departments and agencies remains a recurrent risk. A lapse in appropriations for government departments or agencies would result in a…","tags":[]},{"change_type":"removed","id":"chg_3fe6288bee2675cb","materiality":0.686,"snippet":"On March 13, 2019, the FAA issued an order to suspend operations of all 737 MAX aircraft in the U.S. and by U.S. aircraft operators following two fatal 737 MAX accidents. Non-U.S. civil aviation…","tags":["amount","government_inquiry","litigation","settlement"]},{"change_type":"removed","id":"chg_0990bf21498ce43d","materiality":0.28,"snippet":"During 2019, we announced plans to reduce, and ultimately to suspend 737 production. Impacts related to our suspension of 737 MAX production from 2019 to 2020 significantly increased costs to…","tags":["amount"]},{"change_type":"modified","id":"chg_2e3faa173e84496d","materiality":0.157,"snippet":"…data and software in its procurement processes, including the implementation of cybersecurity compliance requirements on the Defense Industrial Base, for which the supply chain may not be fully…","tags":[]},{"change_type":"removed","id":"chg_7d4cff424574f086","materiality":0.21,"snippet":"Any further delays in regulatory approval of the 737 MAX in one or more jurisdictions, further disruptions to suppliers and/or the long-term health of the production system, supplier claims or…","tags":[]},{"change_type":"removed","id":"chg_ce04396e0c04b173","materiality":0.315,"snippet":"We have made significant estimates with respect to the 737 program regarding the number of units to be produced, the period during which those units are likely to be produced, and the units'…","tags":["government_inquiry"]},{"change_type":"modified","id":"chg_28eb458906566e7b","materiality":0.14,"snippet":"…that we provide to our customers. Many of our suppliers are experiencing inflationary pressures, as well as disruptions due to the lingering impacts of COVID-19, global supply chain constraints,…","tags":[]},{"change_type":"removed","id":"chg_9ac971111d3a18a5","materiality":0.21,"snippet":"In addition to the impact of COVID-19 described above, our Commercial Airplanes and Global Services businesses depend heavily on commercial airlines, and are subject to unique risks.","tags":[]},{"change_type":"modified","id":"chg_17889fca19566204","materiality":0.124,"snippet":"…do in some areas. In our BCA business, we face aggressive international competition intent on increasing market share. In our BDS business, we anticipate that the effects of defense industry…","tags":[]},{"change_type":"modified","id":"chg_476b4e4c67ec07d8","materiality":0.12,"snippet":"*changes to U.S. and non-U.S. government policies, including sourcing restrictions, requirements to expend a portion of program funds locally and governmental industrial cooperation or participation…","tags":[]},{"change_type":"modified","id":"chg_ed118686bab6a430","materiality":0.126,"snippet":"…taxes, export controls, tariffs, embargoes, sanctions (such as those imposed on Russia) and other trade restrictions;","tags":[]},{"change_type":"modified","id":"chg_b1b87f37f8f1cbe9","materiality":0.179,"snippet":"…imposed tariffs on each other's imports. Certain aircraft parts and components that Boeing procures are subject to these tariffs. We are mitigating import costs through Duty Drawback Customs…","tags":[]},{"change_type":"modified","id":"chg_3e38ad6708ec3aec","materiality":0.13,"snippet":"We use estimates and make assumptions in accounting for contracts and programs. Changes in our estimates and/or assumptions could adversely affect our future financial results.","tags":[]},{"change_type":"modified","id":"chg_f96b30618b788fa8","materiality":0.243,"snippet":"…and BGS defense businesses generated approximately 60% and 69% of their 2022 revenues from fixed-price contracts. While fixed-price contracts enable us to benefit from performance improvements,…","tags":["amount","amount_changed"]},{"change_type":"added","id":"chg_ad3c8ceaa1fef0a4","materiality":0.21,"snippet":"We rely extensively on information technology systems and networks to operate our company and meet our business objectives. As cyber threats increase in volume and sophistication, the risk to the…","tags":[]},{"change_type":"added","id":"chg_d2616bfe53c28dd4","materiality":0.371,"snippet":"A cyberattack or security breach, whether experienced directly or through our supply chain, could, among other serious consequences, result in loss of intellectual property; unauthorized access to…","tags":["government_inquiry"]},{"change_type":"modified","id":"chg_7e4be7b38b62aaae","materiality":0.177,"snippet":"In addition, we manage information and information technology systems for certain customers and/or suppliers. Many of these customers and/or suppliers face similar security threats. If we were…","tags":[]},{"change_type":"modified","id":"chg_f5a822996199c594","materiality":0.23,"snippet":"…continue to actively manage our liquidity. As of December 31, 2022, our debt totaled $57.0 billion of which approximately $14.5 billion of principal payments on outstanding debt will become due…","tags":["amount","amount_changed"]},{"change_type":"modified","id":"chg_c48d4080c8b701d2","materiality":0.232,"snippet":"…may receive indemnification from the U.S. government. The amount of our insurance coverage may not cover all claims or liabilities, and we may be forced to bear substantial costs. For example,…","tags":[]},{"change_type":"removed","id":"chg_e81c89371679ab75","materiality":0.21,"snippet":"government. The amount of our insurance coverage may not cover all claims or liabilities, and we may be forced to bear substantial costs. For example, liabilities arising from the use of certain of…","tags":[]}],"kind":"risk_factors","to_accession":"0000012927-23-000007"},{"file":1,"from_accession":"0000012927-23-000007","items":[{"change_type":"modified","id":"chg_0253a249c9ce4d0b","materiality":0.868,"snippet":"…accident of Ethiopian Airlines Flight 302. In January 2021, we entered into a Deferred Prosecution Agreement with the U.S. Department of Justice that resolved the Department's investigation into…","tags":["amount","amount_changed","government_inquiry","litigation","settlement"]}],"kind":"contingencies","to_accession":"0000012927-23-000029"},{"file":1,"from_accession":"0000012927-23-000048","items":[{"change_type":"modified","id":"chg_ed255988da707092","materiality":0.314,"snippet":"Various legal proceedings, claims and investigations related to products, contracts, employment and other matters are pending against us. In addition, we are subject to various U.S. government…","tags":["government_inquiry"]},{"change_type":"removed","id":"chg_e595bca3ee71d71d","materiality":0.3,"snippet":"Various legal proceedings, claims and investigations related to products, contracts, employment and other matters are pending against us.","tags":[]}],"kind":"contingencies","to_accession":"0000012927-23-000062"},{"file":1,"from_accession":"0000012927-23-000062","items":[{"change_type":"modified","id":"chg_3faf396b3dbed2b4","materiality":0.335,"snippet":"…addition, we are subject to various government inquiries and investigations from which civil, criminal or administrative proceedings could result or have resulted in the past. Such proceedings…","tags":["government_inquiry"]},{"change_type":"modified","id":"chg_d91c7c6efc0e3709","materiality":0.767,"snippet":"Multiple legal actions and inquiries were initiated as a result of the October 29, 2018 accident of Lion Air Flight 610 and the March 10, 2019 accident of Ethiopian Airlines Flight 302. On January…","tags":["government_inquiry","litigation","settlement"]},{"change_type":"modified","id":"chg_d22b7bb1e821602c","materiality":0.402,"snippet":"…and the dispute is currently in arbitration, which we currently expect to be resolved in 2024.","tags":["amount","litigation","outcome_stated"]}],"kind":"contingencies","to_accession":"0000012927-24-000010"},{"file":2,"from_accession":"0000012927-23-000007","items":[{"change_type":"modified","id":"chg_efd43f92080fd3bd","materiality":0.123,"snippet":"…to generate profits from those customers. Airlines also are experiencing increased fuel and other costs, and the global economy has experienced high inflation.","tags":[]},{"change_type":"added","id":"chg_cb2ed1005a6e7597","materiality":0.21,"snippet":"Our Commercial Airplanes business depends on our ability to maintain a healthy production system, ensure every airplane in our production system conforms to exacting specifications,","tags":[]},{"change_type":"removed","id":"chg_83621ea17b9aeeaa","materiality":0.14,"snippet":"Airlines also are experiencing increased fuel and other costs, and the global economy is experiencing high inflation.","tags":[]},{"change_type":"modified","id":"chg_0461c0b69dc1b646","materiality":0.164,"snippet":"achieve planned production rate targets, successfully develop and certify new aircraft or new derivative aircraft, and meet or exceed stringent performance and reliability standards.","tags":[]},{"change_type":"modified","id":"chg_9cf4b6c53a3886f2","materiality":0.229,"snippet":"…involving extensive coordination and integration with U.S. and non-U.S. suppliers, highly-skilled labor performed by thousands of employees of ours and other partners, and stringent and evolving…","tags":[]},{"change_type":"added","id":"chg_194bfeaac8c4b1ec","materiality":0.455,"snippet":"On January 10, 2024, the FAA notified us that it has initiated an investigation into our quality control system. This was followed by the FAA announcing actions to increase its oversight of us,…","tags":["government_inquiry"]},{"change_type":"added","id":"chg_e4d42091decb15cf","materiality":0.21,"snippet":"The introduction of new aircraft programs and/or derivatives, such as the 777X, 737-7 and 737-10, involves risks associated with meeting development, testing, certification and production schedules.…","tags":[]},{"change_type":"modified","id":"chg_38b1ed26b8c2b6aa","materiality":0.152,"snippet":"A number of our customers have contractual remedies, including compensation for late deliveries or rights to reject individual airplane deliveries based on delivery delays. Delays on the 737, 777X…","tags":[]},{"change_type":"modified","id":"chg_965c3b21e276a5cd","materiality":0.138,"snippet":"…several of our commercial aircraft programs. In addition, we continue to seek opportunities to reduce the costs of building our aircraft, including working with our suppliers to reduce supplier…","tags":[]},{"change_type":"modified","id":"chg_79427b28976ceafb","materiality":0.117,"snippet":"…suppliers are experiencing supply chain disruptions and constraints, labor instability and inflationary pressures. We continue to monitor the health and stability of the supply chain. These factors…","tags":[]},{"change_type":"modified","id":"chg_7ea3803ea6cffb9a","materiality":0.139,"snippet":"…U.S. government defense spending or acquisition priorities, as well as significant delays in U.S. government appropriations, could negatively impact our business, financial position and results of…","tags":[]},{"change_type":"modified","id":"chg_eca26cb48b73301e","materiality":0.119,"snippet":"…such as authorization and appropriations bills. The government may also constrain discretionary spending by instituting enforceable spending caps.","tags":[]},{"change_type":"modified","id":"chg_51fda4b8e9d2ebe2","materiality":0.189,"snippet":"The timeliness of annual appropriations for U.S. government departments and agencies remains a recurrent risk. Congress may fund government departments and agencies with one or more continuing…","tags":[]},{"change_type":"modified","id":"chg_a6ec6ea78c5d2372","materiality":0.119,"snippet":"…experiencing inflationary pressures, as well as resource constraints and disruptions due to production quality issues, global supply chain constraints, and labor instability. If one or more of our…","tags":[]},{"change_type":"modified","id":"chg_c1de020b9fee89f5","materiality":0.127,"snippet":"Approximately 57,000 employees, which constitute 33% of our total workforce, were union represented as of December 31, 2023 under collective bargaining agreements with varying durations and…","tags":[]},{"change_type":"modified","id":"chg_d02f85760a7918ed","materiality":0.049,"snippet":"…our markets and with respect to our products and services may reduce our future contracts and sales.","tags":[]},{"change_type":"modified","id":"chg_16c074ee59625fe6","materiality":0.134,"snippet":"…is a significant market for commercial aircraft and we have long-standing relationships with our Chinese customers, who represent a key component of our commercial aircraft backlog. If we are…","tags":[]},{"change_type":"modified","id":"chg_3e443cdcd9326c06","materiality":0.229,"snippet":"…and BGS defense businesses generated approximately 58% and 65% of their 2023 revenues from fixed-price contracts. While fixed-price contracts enable us to benefit from performance improvements,…","tags":["amount","amount_changed"]},{"change_type":"modified","id":"chg_212e80242fbffb55","materiality":0.157,"snippet":"…these development programs have highly complex designs and technical challenges. In addition, technical or quality issues could lead to schedule delays and cost impacts, which could increase our…","tags":[]},{"change_type":"modified","id":"chg_fdb3490268a9bf67","materiality":0.182,"snippet":"…company and meet our business objectives. We face various cyber security threats, including attempts to gain unauthorized access to our systems and networks, denial-of-service attacks, threats to…","tags":[]},{"change_type":"modified","id":"chg_b324f169670e2ba6","materiality":0.272,"snippet":"A cyber-related attack or security breach, whether experienced directly or through our supply chain or third party-service providers, could, among other serious consequences, result in loss of…","tags":["government_inquiry"]},{"change_type":"added","id":"chg_8a7974803ddf69b9","materiality":0.21,"snippet":"We have experienced, and may in the future experience, whether directly or through our supply chain, third-party service providers or other channels, cybersecurity incidents. While prior…","tags":[]},{"change_type":"modified","id":"chg_59d30b1133628f30","materiality":0.136,"snippet":"…information technology systems for certain customers and suppliers. Many of these customers and suppliers face similar security threats. If we were unable to protect against the unauthorized…","tags":[]},{"change_type":"modified","id":"chg_a560c7d600153e58","materiality":0.13,"snippet":"…our products, require new or additional investments in production systems or product designs, result in additional carbon offset investments or otherwise negatively impact our business and/or…","tags":[]},{"change_type":"modified","id":"chg_b5e74c23551d4ee5","materiality":0.235,"snippet":"…fund our operations and contractual commitments. As of December 31, 2023, our debt totaled $52.3 billion of which approximately $17.7 billion of principal payments on outstanding debt will become…","tags":["amount","amount_changed"]},{"change_type":"modified","id":"chg_28b0d1849bac61f9","materiality":0.122,"snippet":"…U.S., potentially resulting in significant liabilities. The amount of insurance coverage we maintain may be inadequate to cover these or other claims or liabilities.","tags":[]}],"kind":"risk_factors","to_accession":"0000012927-24-000010"},{"file":1,"from_accession":"0000012927-24-000010","items":[{"change_type":"modified","id":"chg_bf2aa09d22edbff0","materiality":0.776,"snippet":"…737 MAX by the Federal Aviation Administration. Among other obligations, the DPA includes a three-year reporting period, which ended earlier this year. The Department is currently considering…","tags":["government_inquiry","litigation","settlement"]}],"kind":"contingencies","to_accession":"0000012927-24-000025"},{"file":1,"from_accession":"0000012927-24-000025","items":[{"change_type":"added","id":"chg_6ab46e24d760e89a","materiality":0.98,"snippet":"Multiple legal actions and inquiries were initiated as a result of the October 29, 2018 accident of Lion Air Flight 610 and the March 10, 2019 accident of Ethiopian Airlines Flight 302. On January…","tags":["amount","government_inquiry","litigation","settlement"]},{"change_type":"modified","id":"chg_001241dcd4a24425","materiality":0.745,"snippet":"Multiple legal actions were initiated as a result of the January 5, 2024 Alaska Airlines Flight 1282 accident. We are also subject to multiple governmental and regulatory investigations and…","tags":["government_inquiry","litigation","settlement"]}],"kind":"contingencies","to_accession":"0000012927-24-000055"},{"file":1,"from_accession":"0000012927-24-000055","items":[{"change_type":"modified","id":"chg_470f8c26a60fc5bd","materiality":0.308,"snippet":"…results of operations or cash flows. Except as otherwise described below, we cannot reasonably estimate a range of loss in excess of recorded amounts, if any, for the matters set forth below.","tags":["government_inquiry"]},{"change_type":"modified","id":"chg_3633bc71a8c4177d","materiality":0.415,"snippet":"…meet certain required closing conditions. Embraer disputed our right to terminate the agreements, and the dispute was submitted to arbitration. Arbitration proceedings concluded on September 13,…","tags":["amount","amount_changed","litigation"]}],"kind":"contingencies","to_accession":"0000012927-24-000082"},{"file":1,"from_accession":"0000012927-24-000082","items":[{"change_type":"modified","id":"chg_04806c1b3f1a2253","materiality":0.319,"snippet":"…and investigations related to products, contracts, employment, securities and other matters are pending against us. In addition, we are subject to various government inquiries and investigations…","tags":["government_inquiry"]},{"change_type":"modified","id":"chg_2bc823f90640af1d","materiality":0.916,"snippet":"Multiple legal actions, investigations and inquiries were initiated concerning the October 29, 2018, accident of Lion Air Flight 610 and the March 10, 2019 accident of Ethiopian Airlines Flight 302.…","tags":["amount","government_inquiry","litigation","outcome_stated","settlement"]},{"change_type":"modified","id":"chg_1a10eca607c36ec8","materiality":0.556,"snippet":"…a result of the January 5, 2024, Alaska Airlines Flight 1282 accident. We are also subject to multiple governmental and regulatory investigations and inquiries relating to the Alaska Airlines…","tags":["government_inquiry","litigation"]},{"change_type":"added","id":"chg_c0c5dbbb373ea2f2","materiality":0.38,"snippet":"We cannot reasonably estimate a range of loss, if any, not covered by available insurance and in excess of any accrued amounts that may result given the current status of pending lawsuits,…","tags":["litigation"]},{"change_type":"removed","id":"chg_c6908084f629519a","materiality":0.48,"snippet":"During 2019, we entered into agreements with Embraer S.A. (Embraer) to establish joint ventures that included the commercial aircraft and services operations of Embraer, of which we were expected to…","tags":["amount","litigation"]}],"kind":"contingencies","to_accession":"0000012927-25-000015"},{"file":0,"from_accession":"0000012927-24-000082","items":[{"change_type":"added","id":"chg_fb94b783f7d4193d","materiality":0.2,"snippet":"We incorporate by reference into this Item our disclosures made in Note 22 to our Consolidated Financial Statements.","tags":[]},{"change_type":"removed","id":"chg_798c27f52c1eda51","materiality":0.3,"snippet":"Currently, we are involved in a number of legal proceedings. For a discussion of contingencies related to legal proceedings, see Note 18 to our Condensed Consolidated Financial Statements, which is…","tags":[]}],"kind":"legal_proceedings","to_accession":"0000012927-25-000015"},{"file":2,"from_accession":"0000012927-24-000010","items":[{"change_type":"added","id":"chg_aa25bab516e6be9b","materiality":0.21,"snippet":"An investment in our securities involves risks and uncertainties, including those described below, which can materially affect our business, financial position, results of operations and cash flows.…","tags":[]},{"change_type":"removed","id":"chg_dab70cc66eae07a2","materiality":0.21,"snippet":"An investment in our common stock or debt securities involves risks and uncertainties, and our actual results and future trends may differ materially from our past or projected future performance.…","tags":[]},{"change_type":"modified","id":"chg_88b433f312ddea84","materiality":0.402,"snippet":"For example, as a result of the Alaska Airlines 737-9 accident in January 2024, the FAA investigated the 737 quality control system, including Spirit, and increased its oversight of our production…","tags":["government_inquiry"]},{"change_type":"modified","id":"chg_0e9e108cc28e8675","materiality":0.13,"snippet":"…of certification and entry into service. There have been delays on each of these development programs and if we experience additional delays in achieving certification, our financial position,…","tags":[]},{"change_type":"modified","id":"chg_714fee9cfb91a10e","materiality":0.122,"snippet":"…available only at very high prices, including as a result of increased tariffs and trade restrictions, or has quality issues or defects, we may be unable to deliver one or more of our products in a…","tags":[]},{"change_type":"added","id":"chg_d57ce7177572c9e7","materiality":0.21,"snippet":"Some of our and our suppliers' workforces are represented by labor unions. Work stoppages by our employees have adversely affected and could continue to adversely affect our business, financial…","tags":[]},{"change_type":"removed","id":"chg_6a45e2dbec37599f","materiality":0.14,"snippet":"Some of our and our suppliers' workforces are represented by labor unions, which may lead to work stoppages.","tags":[]},{"change_type":"added","id":"chg_ac4a7604ab667d49","materiality":0.28,"snippet":"Approximately 58,000 employees, which constitute 34% of our total workforce, were union represented as of December 31, 2024 under collective bargaining agreements with varying durations and…","tags":["amount"]},{"change_type":"modified","id":"chg_7edffc7a134075d4","materiality":0.203,"snippet":"The unions may also limit our flexibility in managing our workforce and operations. Union actions at suppliers also affect us. Work stoppages and instability in our union relationships delay the…","tags":[]},{"change_type":"added","id":"chg_f9dd562412adc84a","materiality":0.21,"snippet":"*changes in the global trade environment, including potential deterioration in geopolitical or trade relations between countries;","tags":[]},{"change_type":"added","id":"chg_432b2c1d5c0d4753","materiality":0.14,"snippet":"*disputes with authorities in non-U.S. jurisdictions, including international trade authorities;","tags":[]},{"change_type":"modified","id":"chg_c41c702e4d52a28b","materiality":0.179,"snippet":"*tariffs, duties or penalties attributable to the importation of raw materials, parts, products and services, which could impact sales and/or delivery of products and services outside the U.S.…","tags":[]},{"change_type":"modified","id":"chg_c54bf971030862b7","materiality":0.126,"snippet":"…taxes, export controls, tariffs, embargoes, sanctions and other trade restrictions;","tags":[]},{"change_type":"modified","id":"chg_f58fb4bfa52e2efe","materiality":0.224,"snippet":"…warranty costs for the total program. Changes to customer or model mix, production costs and rates, learning curve, changes to price escalation indices, costs of derivative aircraft, supplier…","tags":["settlement"]},{"change_type":"added","id":"chg_4ab07dff932709ac","materiality":0.21,"snippet":"Our pending acquisition of Spirit AeroSystems Holdings, Inc. (Spirit) subjects us to various risks and uncertainties, including risks that we may not complete the acquisition or realize the…","tags":[]},{"change_type":"added","id":"chg_3ac1f04903bbad5d","materiality":0.21,"snippet":"On June 30, 2024, we entered into an Agreement and Plan of Merger (Merger Agreement) to acquire Spirit in an all-stock transaction that will include the assumption of Spirit's net debt at closing.…","tags":[]},{"change_type":"modified","id":"chg_91cfa2305221d1ad","materiality":0.121,"snippet":"…realize the anticipated benefits from these acquisitions, including our acquisition of Spirit, and related activities depends, in part, upon our ability to integrate the operations of the acquired…","tags":[]},{"change_type":"modified","id":"chg_1c689f6230585467","materiality":0.226,"snippet":"…and BGS defense businesses generated approximately 54% and 63% of their 2024 revenues from fixed-price contracts. Fixed-price development contracts subject us to the risk of reduced margins or…","tags":["amount","amount_changed"]},{"change_type":"modified","id":"chg_4890f159b85eae83","materiality":0.053,"snippet":"Risks Related to Technology, Security and Business Disruptions","tags":[]},{"change_type":"added","id":"chg_c3e4733bed100361","materiality":0.21,"snippet":"Managing a complex, global IT infrastructure exposes us to a variety of risks that could negatively impact our business.","tags":[]},{"change_type":"added","id":"chg_7339b03de7903a98","materiality":0.21,"snippet":"Our company runs on a complex global technology infrastructure consisting of millions of physical and digital systems dispersed around the world and managed by different parts of the business. This…","tags":[]},{"change_type":"modified","id":"chg_4969fea1f9bb5cc3","materiality":0.134,"snippet":"Compromised or unauthorized access of our, our customers' and/or our suppliers' systems or data could negatively impact our business.","tags":[]},{"change_type":"modified","id":"chg_aafa40e2f063e7b7","materiality":0.116,"snippet":"We face various cybersecurity threats, including attempts to gain unauthorized access to our systems and networks, denial-of-service attacks, threats to our information technology infrastructure,…","tags":[]},{"change_type":"modified","id":"chg_261332360e63d163","materiality":0.132,"snippet":"…services; and/or result in reputational harm. There is no guarantee that our controls, policy enforcement mechanisms, monitoring systems or contractual arrangements will be sufficient to prevent or…","tags":[]},{"change_type":"modified","id":"chg_20a40af926964a69","materiality":0.28,"snippet":"…number of litigation matters. These matters divert financial and management resources that would otherwise be used to benefit our operations. No assurances can be given that the results of these…","tags":["government_inquiry","litigation"]},{"change_type":"removed","id":"chg_f06640ae90ecf802","materiality":0.21,"snippet":"We may be unable to obtain debt to fund our operations and contractual commitments at competitive rates, on commercially reasonable terms or in sufficient amounts.","tags":[]},{"change_type":"modified","id":"chg_6504ff50af9af796","materiality":0.121,"snippet":"From time to time, in alignment with our sustainability priorities, we establish and publicly announce goals and commitments to improve our environmental performance, within our products and/or…","tags":[]},{"change_type":"added","id":"chg_b7de1c49ce3f91d4","materiality":0.21,"snippet":"We may be unable to effectively manage our liquidity, which could adversely affect our business, financial position and results of operations.","tags":[]},{"change_type":"added","id":"chg_6cf598cab2913d22","materiality":0.28,"snippet":"We depend, in part, on our ability to successfully access the capital and financial markets to fund our operations and contractual commitments. Net cash used by operating activities for the year…","tags":["amount"]},{"change_type":"modified","id":"chg_2d4da341c9847fa9","materiality":0.306,"snippet":"We have in the past experienced and could in the future experience further downgrades in our credit ratings. Any such downgrades, as well as other factors including disruptions or declines in the…","tags":["amount","amount_changed"]},{"change_type":"added","id":"chg_a5131c545d98f4ab","materiality":0.21,"snippet":"The issuance of common stock upon the closing of the Spirit acquisition and upon conversion of our Mandatory convertible preferred stock, and the possibility of the sale or issuance of our common…","tags":[]},{"change_type":"added","id":"chg_b4e7d2075bc66e8e","materiality":0.385,"snippet":"On the terms and subject to the conditions set forth in the Merger Agreement, each share of Spirit common stock will be exchanged for a number of shares of our common stock equal to an exchange…","tags":["amount","settlement"]},{"change_type":"added","id":"chg_fd839671df5f5d89","materiality":0.21,"snippet":"Our common stock ranks junior to the Mandatory convertible preferred stock with respect to dividends and amounts payable in the event of our liquidation, dissolution or winding-up of our affairs.","tags":[]},{"change_type":"added","id":"chg_a820d605ce9a40c9","materiality":0.28,"snippet":"Our common stock ranks junior to the Mandatory convertible preferred stock with respect to the payment of dividends and amounts payable in the event of our liquidation, dissolution or winding-up of…","tags":["amount"]}],"kind":"risk_factors","to_accession":"0000012927-25-000015"},{"file":1,"from_accession":"0000012927-25-000015","items":[{"change_type":"modified","id":"chg_d7b0eac3b56229cf","materiality":0.439,"snippet":"…a result of the January 5, 2024 737-9 door plug accident. We are also subject to multiple governmental and regulatory investigations and inquiries relating to the 737-9 door plug accident and our…","tags":["government_inquiry"]}],"kind":"contingencies","to_accession":"0000012927-25-000031"},{"file":0,"from_accession":"0000012927-25-000015","items":[{"change_type":"added","id":"chg_645a64d19f08d6b7","materiality":0.3,"snippet":"Currently, we are involved in a number of legal proceedings. For a discussion of contingencies related to legal proceedings, see Note 17 to our Condensed Consolidated Financial Statements, which is…","tags":[]},{"change_type":"removed","id":"chg_ab1429967b5c6ddb","materiality":0.2,"snippet":"We incorporate by reference into this Item our disclosures made in Note 22 to our Consolidated Financial Statements.","tags":[]}],"kind":"legal_proceedings","to_accession":"0000012927-25-000031"},{"file":1,"from_accession":"0000012927-25-000031","items":[{"change_type":"modified","id":"chg_234f2a5d9473df3a","materiality":0.931,"snippet":"…others are still pending, including a number of civil lawsuits and claims brought by family members of those who died in the accidents. In addition, a motion to certify a class of plaintiffs is…","tags":["amount","amount_changed","government_inquiry","litigation","settlement"]},{"change_type":"added","id":"chg_05eccb94d96011bb","materiality":0.78,"snippet":"On May 14, 2024, the Department notified us of its determination that we did not fulfill our obligations under the DPA and that the Department would not move to dismiss the case. On May 29, 2025,…","tags":["amount","litigation","outcome_stated","settlement"]}],"kind":"contingencies","to_accession":"0000012927-25-000062"},{"file":1,"from_accession":"0001628280-25-047023","items":[{"change_type":"modified","id":"chg_fa01f06e5bc213ed","materiality":0.358,"snippet":"We are subject, from time to time, to various legal proceedings and claims related to our business that cover a wide range of matters, including those related to products, contracts, labor and…","tags":["government_inquiry"]},{"change_type":"modified","id":"chg_a80b117f29c864a7","materiality":0.656,"snippet":"On May 29, 2025, Boeing and the Department of Justice (the Department) entered into a non-prosecution agreement (the Agreement) to resolve the Department's determination that Boeing did not fulfill…","tags":["amount","amount_changed","litigation","settlement"]},{"change_type":"modified","id":"chg_c397373ea1bc6e03","materiality":0.694,"snippet":"Certain legal actions and investigations arising out of the MAX accidents and subsequent grounding of the 737 MAX are still pending, including fewer than five civil lawsuits by family members of…","tags":["government_inquiry","litigation","settlement"]},{"change_type":"modified","id":"chg_ac10a97598ae8b0d","materiality":0.332,"snippet":"Given the status of these legal actions and investigations, we cannot reasonably estimate a range of loss, if any, not covered by available insurance and in excess of any accrued amounts, that may…","tags":["litigation"]},{"change_type":"removed","id":"chg_490db838a1ff234b","materiality":0.56,"snippet":"Multiple legal actions were initiated as a result of the January 5, 2024 737-9 door plug accident. We are also subject to multiple governmental and regulatory investigations and inquiries relating…","tags":["government_inquiry"]}],"kind":"contingencies","to_accession":"0001628280-26-004357"},{"file":0,"from_accession":"0001628280-25-047023","items":[{"change_type":"added","id":"chg_da0b6d6d743e2153","materiality":0.2,"snippet":"We incorporate by reference into this Item our disclosures made in Note 23 to our Consolidated Financial Statements.","tags":[]},{"change_type":"removed","id":"chg_d5a29dcf1be017da","materiality":0.3,"snippet":"Currently, we are involved in a number of legal proceedings. For a discussion of contingencies related to legal proceedings, see Note 19 to our Condensed Consolidated Financial Statements, which is…","tags":[]}],"kind":"legal_proceedings","to_accession":"0001628280-26-004357"},{"file":2,"from_accession":"0000012927-25-000015","items":[{"change_type":"modified","id":"chg_fb640cc45f66db58","materiality":0.125,"snippet":"…to generate profits from those customers. Our customers' fleet decisions and financial position are also impacted by fuel and other costs, as well as inflationary pressures.","tags":[]},{"change_type":"modified","id":"chg_52c1f8153fe06240","materiality":0.164,"snippet":"…production system conforms to exacting specifications, achieve planned production rate targets, successfully develop and certify new aircraft or new derivative aircraft, and meet or exceed…","tags":[]},{"change_type":"modified","id":"chg_2eb187833f644c2c","materiality":0.148,"snippet":"…highly-skilled labor performed by thousands of employees, and stringent and evolving regulatory requirements and performance and reliability standards. As a result, our ability to deliver aircraft…","tags":[]},{"change_type":"removed","id":"chg_4dded45216d8ec07","materiality":0.21,"snippet":"achieve planned production rate targets, successfully develop and certify new aircraft or new derivative aircraft, and meet or exceed stringent performance and reliability standards.","tags":[]},{"change_type":"modified","id":"chg_f39f2980ebecbdbb","materiality":0.315,"snippet":"The introduction of new aircraft programs and/or derivatives, such as the 777X, 737-7 and 737-10, takes years and involves significant risks associated with meeting development, testing,…","tags":["amount","amount_changed"]},{"change_type":"modified","id":"chg_1ce13a9befd46948","materiality":0.154,"snippet":"…disruption caused by production changes, achieve and maintain operational stability and implement productivity improvements to meet customer demand and maintain our profitability. We have plans to…","tags":[]},{"change_type":"removed","id":"chg_90e31834e686e9ee","materiality":0.42,"snippet":"For example, as a result of the Alaska Airlines 737-9 accident in January 2024, the FAA investigated the 737 quality control system, including Spirit, and increased its oversight of our production…","tags":["government_inquiry"]},{"change_type":"modified","id":"chg_96d79f6ddb1bd604","materiality":0.145,"snippet":"…is extremely complex. Operational issues, including certification and/or delivery delays, quality issues, labor instability, supply chain constraints, defects in supplier components, failure to…","tags":[]},{"change_type":"removed","id":"chg_39774cfc987eb262","materiality":0.21,"snippet":"The introduction of new aircraft programs and/or derivatives, such as the 777X, 737-7 and 737-10, involves risks associated with meeting development, testing, certification and production schedules.…","tags":[]},{"change_type":"modified","id":"chg_6a137b529af860e8","materiality":0.286,"snippet":"Approximately 72,000 employees, or 40% of our total workforce, were union represented as of December 31, 2025, under collective bargaining agreements with varying durations and expiration dates. As…","tags":["amount","amount_changed"]},{"change_type":"modified","id":"chg_9ad9ff70c6002296","materiality":0.145,"snippet":"…risks of doing business in other countries, including those related to tariffs, trade restrictions and government actions.","tags":[]},{"change_type":"modified","id":"chg_f14ac5f121271ebe","materiality":0.133,"snippet":"In 2025, non-U.S. customers, which include Foreign Military Sales through the U.S. government (FMS), accounted for 46% of our total revenues and 60% of Commercial Airplanes revenue from customer…","tags":[]},{"change_type":"removed","id":"chg_e568858e3f3c4ef3","materiality":0.21,"snippet":"The unions may also limit our flexibility in managing our workforce and operations. Union actions at suppliers also affect us. Work stoppages and instability in our union relationships delay the…","tags":[]},{"change_type":"added","id":"chg_e764af083927e696","materiality":0.21,"snippet":"While the impact of these factors is difficult to predict, any one or more of these factors could adversely affect our operations.","tags":[]},{"change_type":"added","id":"chg_63ef411a6d562f20","materiality":0.21,"snippet":"The global trade environment remains highly dynamic and continues to evolve. Current U.S. trade policy includes the imposition of baseline, sectoral or country-specific tariffs on imports. Other…","tags":[]},{"change_type":"modified","id":"chg_84f1b801ddc362e5","materiality":0.188,"snippet":"China is a significant market for commercial aircraft and we have long-standing relationships with our Chinese customers. Overall, the U.S.-China trade relationship is challenged due to tariffs,…","tags":[]},{"change_type":"added","id":"chg_a6e8ac07fabb6913","materiality":0.21,"snippet":"Impacts from potential deterioration in geopolitical or trade relationships between the U.S. and other countries, particularly China and European Union member states, including as a result of the…","tags":[]},{"change_type":"modified","id":"chg_62f9713793184aa9","materiality":0.164,"snippet":"…the anticipated benefits from these acquisitions, and related activities depends, in part, upon our ability to integrate the operations of the acquired business, the performance of the underlying…","tags":[]},{"change_type":"removed","id":"chg_485b176508106b7c","materiality":0.21,"snippet":"Our pending acquisition of Spirit AeroSystems Holdings, Inc. (Spirit) subjects us to various risks and uncertainties, including risks that we may not complete the acquisition or realize the…","tags":[]},{"change_type":"removed","id":"chg_d05d6b0bf79d1c9f","materiality":0.21,"snippet":"On June 30, 2024, we entered into an Agreement and Plan of Merger (Merger Agreement) to acquire Spirit in an all-stock transaction that will include the assumption of Spirit's net debt at closing.…","tags":[]},{"change_type":"modified","id":"chg_69d21158e8ba00b3","materiality":0.126,"snippet":"In 2025, 35% of our revenues were earned pursuant to U.S. government contracts, which include FMS. Business conducted pursuant to such contracts is subject to extensive procurement regulations and…","tags":[]},{"change_type":"modified","id":"chg_6ec7521cedb5b5a2","materiality":0.069,"snippet":"Our fixed-price contracts subject us to losses when we have cost overruns.","tags":[]},{"change_type":"modified","id":"chg_4b23cc410046f062","materiality":0.139,"snippet":"Our BDS and BGS defense businesses each generated approximately 60% of their 2025 revenues from fixed-price contracts. Fixed-price contracts subject us to the risk of reduced margins or incurring…","tags":["amount"]},{"change_type":"modified","id":"chg_a4f329db24714ba8","materiality":0.187,"snippet":"Estimating the costs, including labor costs, and time for us and our suppliers to complete fixed-price development and follow-on production contracts is inherently uncertain and subject to…","tags":[]},{"change_type":"modified","id":"chg_13a1ab378a7d0eca","materiality":0.148,"snippet":"…experience, whether directly or through our subsidiaries or our supply chain, third-party service providers or other channels, cyber-related incidents. There is no guarantee that a future…","tags":[]},{"change_type":"modified","id":"chg_53e5444c7e99a894","materiality":0.224,"snippet":"…fund our operations and contractual commitments. As of December 31, 2025, our debt totaled $54.1 billion, of which approximately $15.5 billion of principal payments on outstanding debt are…","tags":["amount","amount_changed"]},{"change_type":"modified","id":"chg_9f2285fd263ba489","materiality":0.15,"snippet":"The issuance of our common stock upon conversion of our Mandatory convertible preferred stock, and the exchange of the Spirit Exchangeable Notes, as well as any other issuances of our common stock,…","tags":[]},{"change_type":"modified","id":"chg_c67c771ce72dd089","materiality":0.375,"snippet":"Unless earlier converted, each outstanding share of Mandatory convertible preferred stock will automatically convert for settlement on or about October 15, 2027, into between 5.8280 and 6.9940…","tags":["amount","amount_changed","settlement"]},{"change_type":"removed","id":"chg_fd6659e50c4449d2","materiality":0.21,"snippet":"A significant portion of our customer financing portfolio is concentrated among certain customers and in certain types of Boeing aircraft, which exposes us to concentration risks.","tags":[]},{"change_type":"removed","id":"chg_5ad887faf21c3e12","materiality":0.21,"snippet":"A significant portion of our customer financing portfolio, which is comprised of financing receivables and operating lease equipment, is concentrated among certain customers and in distinct…","tags":[]}],"kind":"risk_factors","to_accession":"0001628280-26-004357"},{"file":1,"from_accession":"0001628280-26-004357","items":[{"change_type":"modified","id":"chg_c0c24afbe08a4b26","materiality":0.402,"snippet":"…May 29, 2025, Boeing and the U.S. Department of Justice (the Department) entered into a non-prosecution agreement (the Agreement) to resolve the Department's determination that Boeing did not…","tags":["amount","litigation","settlement"]},{"change_type":"modified","id":"chg_de2cedbe47cf766f","materiality":0.251,"snippet":"…In addition, securities lawsuits are pending, and we are appealing the March 16, 2026, partial grant of a motion for class certification by the U.S. District Court for the Northern District of…","tags":["litigation"]}],"kind":"contingencies","to_accession":"0001628280-26-026458"},{"file":0,"from_accession":"0001628280-26-004357","items":[{"change_type":"added","id":"chg_1087d4cefec43f96","materiality":0.3,"snippet":"Currently, we are involved in a number of legal proceedings. For a discussion of contingencies related to legal proceedings, see Note 18 to our Condensed Consolidated Financial Statements, which is…","tags":[]},{"change_type":"removed","id":"chg_a12d68ed12faaed3","materiality":0.2,"snippet":"We incorporate by reference into this Item our disclosures made in Note 23 to our Consolidated Financial Statements.","tags":[]}],"kind":"legal_proceedings","to_accession":"0001628280-26-026458"},{"file":1,"from_accession":"0001628280-26-026458","items":[{"change_type":"modified","id":"chg_d0a1e56fd07ff220","materiality":0.385,"snippet":"…of the Motion. Those representatives have until late August 2026 to decide whether to pursue any further appeal.","tags":["amount","litigation","settlement"]}],"kind":"contingencies","to_accession":"0001628280-26-050038"},{"file":1,"from_accession":"0001628280-26-050038","items":[{"change_type":"modified","id":"chg_c3c3fb6b1d9f312e","materiality":0.638,"snippet":"…flight 302 accident (the MAX accidents). In September 2026 following the final conclusion of court proceedings, Boeing released from escrow $689 for payments required by the Agreement.","tags":["amount","amount_changed","litigation","settlement"]},{"change_type":"modified","id":"chg_800a35983c55c344","materiality":0.372,"snippet":"Certain legal actions and investigations arising out of the MAX accidents and subsequent grounding of the 737 MAX are still pending, including fewer than five civil lawsuits by family members of…","tags":["litigation"]},{"change_type":"removed","id":"chg_b6f1cad889ddcf53","materiality":0.38,"snippet":"Certain legal actions and investigations arising out of the MAX accidents and subsequent grounding of the 737 MAX are still pending, including fewer than five civil lawsuits by family members of…","tags":["litigation"]}],"kind":"contingencies","to_accession":"0001628280-26-067508"}],"company":{"cik":"0000012927","name":"BOEING CO","page_url":"/company/0000012927/","ticker":"BA"},"filings":[{"accession":"0000012927-21-000011","filed_date":"2021-02-01","form":"10-K","report_date":"2020-12-31","sections":{"contingencies":{"char_len":4488,"method":"ixbrl:LegalMattersAndContingenciesTextBlock","xref":null},"legal_proceedings":{"char_len":221,"method":"item_heading","xref":"Note 21"},"risk_factors":{"char_len":55403,"method":"item_heading","xref":null}},"url":"https://www.sec.gov/Archives/edgar/data/12927/000001292721000011/ba-20201231.htm"},{"accession":"0000012927-21-000040","filed_date":"2021-04-28","form":"10-Q","report_date":"2021-03-31","sections":{"contingencies":{"char_len":4761,"method":"ixbrl:LegalMattersAndContingenciesTextBlock","xref":null},"legal_proceedings":{"char_len":231,"method":"item_heading","xref":"Note 17"},"risk_factors":{"char_len":181,"method":"item_heading","xref":null}},"url":"https://www.sec.gov/Archives/edgar/data/12927/000001292721000040/ba-20210331.htm"},{"accession":"0000012927-21-000073","filed_date":"2021-07-28","form":"10-Q","report_date":"2021-06-30","sections":{"contingencies":{"char_len":4761,"method":"ixbrl:LegalMattersAndContingenciesTextBlock","xref":null},"legal_proceedings":{"char_len":231,"method":"item_heading","xref":"Note 17"},"risk_factors":{"char_len":181,"method":"item_heading","xref":null}},"url":"https://www.sec.gov/Archives/edgar/data/12927/000001292721000073/ba-20210630.htm"},{"accession":"0000012927-21-000094","filed_date":"2021-10-27","form":"10-Q","report_date":"2021-09-30","sections":{"contingencies":{"char_len":4761,"method":"ixbrl:LegalMattersAndContingenciesTextBlock","xref":null},"legal_proceedings":{"char_len":231,"method":"item_heading","xref":"Note 17"},"risk_factors":{"char_len":181,"method":"item_heading","xref":null}},"url":"https://www.sec.gov/Archives/edgar/data/12927/000001292721000094/ba-20210930.htm"},{"accession":"0000012927-22-000010","filed_date":"2022-01-31","form":"10-K","report_date":"2021-12-31","sections":{"contingencies":{"char_len":5065,"method":"ixbrl:LegalMattersAndContingenciesTextBlock","xref":null},"legal_proceedings":{"char_len":221,"method":"item_heading","xref":"Note 21"},"risk_factors":{"char_len":58966,"method":"item_heading","xref":null}},"url":"https://www.sec.gov/Archives/edgar/data/12927/000001292722000010/ba-20211231.htm"},{"accession":"0000012927-22-000022","filed_date":"2022-04-27","form":"10-Q","report_date":"2022-03-31","sections":{"contingencies":{"char_len":3027,"method":"ixbrl:LegalMattersAndContingenciesTextBlock","xref":null},"legal_proceedings":{"char_len":231,"method":"item_heading","xref":"Note 16"},"risk_factors":{"char_len":181,"method":"item_heading","xref":null}},"url":"https://www.sec.gov/Archives/edgar/data/12927/000001292722000022/ba-20220331.htm"},{"accession":"0000012927-22-000058","filed_date":"2022-07-27","form":"10-Q","report_date":"2022-06-30","sections":{"contingencies":{"char_len":3025,"method":"ixbrl:LegalMattersAndContingenciesTextBlock","xref":null},"legal_proceedings":{"char_len":231,"method":"item_heading","xref":"Note 16"},"risk_factors":{"char_len":181,"method":"item_heading","xref":null}},"url":"https://www.sec.gov/Archives/edgar/data/12927/000001292722000058/ba-20220630.htm"},{"accession":"0000012927-22-000073","filed_date":"2022-10-26","form":"10-Q","report_date":"2022-09-30","sections":{"contingencies":{"char_len":3174,"method":"ixbrl:LegalMattersAndContingenciesTextBlock","xref":null},"legal_proceedings":{"char_len":231,"method":"item_heading","xref":"Note 17"},"risk_factors":{"char_len":181,"method":"item_heading","xref":null}},"url":"https://www.sec.gov/Archives/edgar/data/12927/000001292722000073/ba-20220930.htm"},{"accession":"0000012927-23-000007","filed_date":"2023-01-27","form":"10-K","report_date":"2022-12-31","sections":{"contingencies":{"char_len":3154,"method":"ixbrl:LegalMattersAndContingenciesTextBlock","xref":null},"legal_proceedings":{"char_len":221,"method":"item_heading","xref":"Note 21"},"risk_factors":{"char_len":48006,"method":"item_heading","xref":null}},"url":"https://www.sec.gov/Archives/edgar/data/12927/000001292723000007/ba-20221231.htm"},{"accession":"0000012927-23-000029","filed_date":"2023-04-26","form":"10-Q","report_date":"2023-03-31","sections":{"contingencies":{"char_len":2926,"method":"ixbrl:LegalMattersAndContingenciesTextBlock","xref":null},"legal_proceedings":{"char_len":231,"method":"item_heading","xref":"Note 16"},"risk_factors":{"char_len":181,"method":"item_heading","xref":null}},"url":"https://www.sec.gov/Archives/edgar/data/12927/000001292723000029/ba-20230331.htm"},{"accession":"0000012927-23-000048","filed_date":"2023-07-26","form":"10-Q","report_date":"2023-06-30","sections":{"contingencies":{"char_len":2926,"method":"ixbrl:LegalMattersAndContingenciesTextBlock","xref":null},"legal_proceedings":{"char_len":231,"method":"item_heading","xref":"Note 16"},"risk_factors":{"char_len":181,"method":"item_heading","xref":null}},"url":"https://www.sec.gov/Archives/edgar/data/12927/000001292723000048/ba-20230630.htm"},{"accession":"0000012927-23-000062","filed_date":"2023-10-25","form":"10-Q","report_date":"2023-09-30","sections":{"contingencies":{"char_len":2927,"method":"ixbrl:LegalMattersAndContingenciesTextBlock","xref":null},"legal_proceedings":{"char_len":231,"method":"item_heading","xref":"Note 17"},"risk_factors":{"char_len":181,"method":"item_heading","xref":null}},"url":"https://www.sec.gov/Archives/edgar/data/12927/000001292723000062/ba-20230930.htm"},{"accession":"0000012927-24-000010","filed_date":"2024-01-31","form":"10-K","report_date":"2023-12-31","sections":{"contingencies":{"char_len":2461,"method":"ixbrl:LegalMattersAndContingenciesTextBlock","xref":null},"legal_proceedings":{"char_len":221,"method":"item_heading","xref":"Note 21"},"risk_factors":{"char_len":48580,"method":"item_heading","xref":null}},"url":"https://www.sec.gov/Archives/edgar/data/12927/000001292724000010/ba-20231231.htm"},{"accession":"0000012927-24-000025","filed_date":"2024-04-24","form":"10-Q","report_date":"2024-03-31","sections":{"contingencies":{"char_len":3021,"method":"ixbrl:LegalMattersAndContingenciesTextBlock","xref":null},"legal_proceedings":{"char_len":231,"method":"item_heading","xref":"Note 16"},"risk_factors":{"char_len":181,"method":"item_heading","xref":null}},"url":"https://www.sec.gov/Archives/edgar/data/12927/000001292724000025/ba-20240331.htm"},{"accession":"0000012927-24-000055","filed_date":"2024-07-31","form":"10-Q","report_date":"2024-06-30","sections":{"contingencies":{"char_len":3782,"method":"ixbrl:LegalMattersAndContingenciesTextBlock","xref":null},"legal_proceedings":{"char_len":231,"method":"item_heading","xref":"Note 18"},"risk_factors":{"char_len":2793,"method":"item_heading","xref":null}},"url":"https://www.sec.gov/Archives/edgar/data/12927/000001292724000055/ba-20240630.htm"},{"accession":"0000012927-24-000082","filed_date":"2024-10-23","form":"10-Q","report_date":"2024-09-30","sections":{"contingencies":{"char_len":3936,"method":"ixbrl:LegalMattersAndContingenciesTextBlock","xref":null},"legal_proceedings":{"char_len":231,"method":"item_heading","xref":"Note 18"},"risk_factors":{"char_len":8486,"method":"item_heading","xref":null}},"url":"https://www.sec.gov/Archives/edgar/data/12927/000001292724000082/ba-20240930.htm"},{"accession":"0000012927-25-000015","filed_date":"2025-02-03","form":"10-K","report_date":"2024-12-31","sections":{"contingencies":{"char_len":3556,"method":"ixbrl:LegalMattersAndContingenciesTextBlock","xref":null},"legal_proceedings":{"char_len":116,"method":"item_heading","xref":"Note 22"},"risk_factors":{"char_len":57844,"method":"item_heading","xref":null}},"url":"https://www.sec.gov/Archives/edgar/data/12927/000001292725000015/ba-20241231.htm"},{"accession":"0000012927-25-000031","filed_date":"2025-04-23","form":"10-Q","report_date":"2025-03-31","sections":{"contingencies":{"char_len":3588,"method":"ixbrl:LegalMattersAndContingenciesTextBlock","xref":null},"legal_proceedings":{"char_len":231,"method":"item_heading","xref":"Note 17"},"risk_factors":{"char_len":4609,"method":"item_heading","xref":null}},"url":"https://www.sec.gov/Archives/edgar/data/12927/000001292725000031/ba-20250331.htm"},{"accession":"0000012927-25-000062","filed_date":"2025-07-29","form":"10-Q","report_date":"2025-06-30","sections":{"contingencies":{"char_len":3999,"method":"ixbrl:LegalMattersAndContingenciesTextBlock","xref":null},"legal_proceedings":{"char_len":231,"method":"item_heading","xref":"Note 18"},"risk_factors":{"char_len":4380,"method":"item_heading","xref":null}},"url":"https://www.sec.gov/Archives/edgar/data/12927/000001292725000062/ba-20250630.htm"},{"accession":"0001628280-25-047023","filed_date":"2025-10-29","form":"10-Q","report_date":"2025-09-30","sections":{"contingencies":{"char_len":3991,"method":"ixbrl:LegalMattersAndContingenciesTextBlock","xref":null},"legal_proceedings":{"char_len":231,"method":"item_heading","xref":"Note 19"},"risk_factors":{"char_len":4380,"method":"item_heading","xref":null}},"url":"https://www.sec.gov/Archives/edgar/data/12927/000162828025047023/ba-20250930.htm"},{"accession":"0001628280-26-004357","filed_date":"2026-01-30","form":"10-K","report_date":"2025-12-31","sections":{"contingencies":{"char_len":2917,"method":"ixbrl:LegalMattersAndContingenciesTextBlock","xref":null},"legal_proceedings":{"char_len":116,"method":"item_heading","xref":"Note 23"},"risk_factors":{"char_len":56848,"method":"item_heading","xref":null}},"url":"https://www.sec.gov/Archives/edgar/data/12927/000162828026004357/ba-20251231.htm"},{"accession":"0001628280-26-026458","filed_date":"2026-04-22","form":"10-Q","report_date":"2026-03-31","sections":{"contingencies":{"char_len":3004,"method":"ixbrl:LegalMattersAndContingenciesTextBlock","xref":null},"legal_proceedings":{"char_len":231,"method":"item_heading","xref":"Note 18"},"risk_factors":{"char_len":181,"method":"item_heading","xref":null}},"url":"https://www.sec.gov/Archives/edgar/data/12927/000162828026026458/ba-20260331.htm"},{"accession":"0001628280-26-050038","filed_date":"2026-07-28","form":"10-Q","report_date":"2026-06-30","sections":{"contingencies":{"char_len":3051,"method":"ixbrl:LegalMattersAndContingenciesTextBlock","xref":null},"legal_proceedings":{"char_len":231,"method":"item_heading","xref":"Note 18"},"risk_factors":{"char_len":181,"method":"item_heading","xref":null}},"url":"https://www.sec.gov/Archives/edgar/data/12927/000162828026050038/ba-20260630.htm"},{"accession":"0001628280-26-067508","filed_date":"2026-10-27","form":"10-Q","report_date":"2026-09-30","sections":{"contingencies":{"char_len":2302,"method":"ixbrl:LegalMattersAndContingenciesTextBlock","xref":null},"legal_proceedings":{"char_len":231,"method":"item_heading","xref":"Note 19"},"risk_factors":{"char_len":181,"method":"item_heading","xref":null}},"url":"https://www.sec.gov/Archives/edgar/data/12927/000162828026067508/ba-20260930.htm"}],"inquiries":[{"absence_evidence":null,"absence_note":null,"absence_verified":false,"absent_from_later_annual":true,"agency_or_court":"DOJ; FAA","cik":"0000012927","company_name":"BOEING CO","confidence":0.878,"events":[{"accession":"0000012927-21-000011","change_type":"first_mention","date":"2021-02-01","excerpt":"On January 6, 2021, we entered into a Deferred Prosecution Agreement with the U.S. Department of Justice that resolves the Department of Justice's previously disclosed investigation into us regarding the evaluation of the 737 MAX airplane by the Federal Aviation Administration. Under the terms of…","url":"https://www.sec.gov/Archives/edgar/data/12927/000001292721000011/ba-20201231.htm"},{"accession":"0000012927-21-000040","change_type":"modified","date":"2021-04-28","excerpt":"On January 6, 2021, we entered into a Deferred Prosecution Agreement with the U.S. Department of Justice that resolves the Department of Justice's previously disclosed investigation into us regarding the evaluation of the 737 MAX airplane by the Federal Aviation Administration. Under the terms of…","url":"https://www.sec.gov/Archives/edgar/data/12927/000001292721000040/ba-20210331.htm"},{"accession":"0000012927-22-000010","change_type":"modified","date":"2022-01-31","excerpt":"On January 6, 2021, we entered into a Deferred Prosecution Agreement with the U.S. Department of Justice that resolves the Department of Justice's previously disclosed investigation into us regarding the evaluation of the 737 MAX airplane by the Federal Aviation Administration. Under the terms of…","url":"https://www.sec.gov/Archives/edgar/data/12927/000001292722000010/ba-20211231.htm"},{"accession":"0000012927-22-000022","change_type":"not_mentioned","date":"2022-04-27","excerpt":"","url":"https://www.sec.gov/Archives/edgar/data/12927/000001292722000022/ba-20220331.htm"}],"first_mentioned":{"accession":"0000012927-21-000011","filed_date":"2021-02-01","form":"10-K","url":"https://www.sec.gov/Archives/edgar/data/12927/000001292721000011/ba-20201231.htm"},"id":"inq_2e14fb11e987770b","last_mentioned":{"accession":"0000012927-22-000010","filed_date":"2022-01-31","form":"10-K","url":"https://www.sec.gov/Archives/edgar/data/12927/000001292722000010/ba-20211231.htm"},"matter_type":"investigation","merged_from":[],"page_url":"/company/0000012927/#inq_2e14fb11e987770b","record_type":"inquiry","review":"model","status":"outcome_stated","title":"DOJ: 737 MAX evaluation investigation and deferred prosecution agreement","updated_at":"2026-10-27"}],"schema_version":"1.0.0","snippets_omitted":0}
